Provided construction oversite for all exterior concrete areas related to a new $650 million Patient Care Tower. Concrete work included:
- Heavy duty roadways
- Light weight concrete over structured decking
- Sidewalks
- Decorative concrete with integral-colored concrete with exposed aggregate
- Retaining walls
Striped four helicopter landing areas on a helipad located on the 20th level