Galleria VI Redevelopment Project
The Galleria VI Redevelopment Project consisted of the revitalization of an existing asphalt parking lot along Westheimer. A-1’s scope consisted of installation of new concrete footings for masonry planters, curbs, light pole bases, and a Top Cast Exposed Aggregate sidewalk.
A-1 also reclaimed the existing asphalt parking lot and installed a new asphalt overlay with new pavement marking layout. Check out the before and after pictures!